Denehy’s Groyne or T-Headed Groyne: After long investigation in different sites, Denehy developed a groyne in the shape of a T. The length of the head is kept as 1⁄2, where L is the length of groyne. A still water pocket is formed on the upstream side where silting takes place. It is constructed with rubble masonry in trapezoidal section. The upstream face is finished with concrete blocks with cement mortar. - Study24x7
Social learning Network
15 Mar 2019 10:05 AM study24x7 study24x7

Denehy’s Groyne or T-Headed Groyne: After long investigation in different sites, Denehy developed a groyne in the shape of a T. The length of the head is kept as 1⁄2, where L is the length of groyne. A still water pocket is formed on the upstream side where silting takes plac...