Basic COCOMO Model The basic COCOMO model gives an approximate estimate of the project parameters. The basic COCOMO estimation model is given by the following expressions: Effort = a1х (KLOC)a2 PM T dev = b1 x (Effort)b2Months - Study24x7
Social learning Network
09 Mar 2019 11:09 AM study24x7 study24x7

Basic COCOMO Model

The basic COCOMO model gives an approximate estimate of the project parameters. The basic COCOMO estimation model is given by the following expressions:
Effort = a1х (KLOC)a2 PM

T dev = b1 x (Effort)b2Months